About Aluminum Alloy Scaffolding Tower Construction Installation and Construction Methods

×

1. Preparation before erection
(1) Check whether the scaffolding facilities are complete, including vertical rod, cross rod, inclined rod, support, safety door, fixed fixture, etc. (2) Determine the erection position, clean up the debris in the erection area, and ensure that the construction site is clean and tidy.
(3) For the height that needs to be constructed, safety measures and protective measures should be carried out to ensure the safety of construction personnel.

2. Steps for erection of scaffolding
(1) First, determine the starting point and end point in the erection area, and set up according to the planned route.
(2) The spacing of the vertical bar is generally about 1.5 meters, fixed on the ground, and the connection point between the vertical bar should be connected with a cross bar.
(3) The connection of the cross bar must be on the vertical bar and be fastened with aluminum alloy
(4) The installation of the inclined rod, the installation position should be as close to the wall as possible to improve stability
(5) Install scaffolding supports and horizontal rods to ensure the balance of the entire scaffold.
(6) Install safety doors and fixed fixtures to ensure the safety of construction personnel.

3. Steps to remove scaffolding
(1) According to the demolition plan, first remove the support and horizontal rods (
(2) Then remove the inclined rod, cross rod and vertical rod in turn.
(3) Finally, clean up the scaffold area, completely remove the scaffold, and keep the site clean.

Matters needing attention
(1) When erecting and removing scaffolding, the relevant safety regulations must be observed
(2) If the construction is carried out at a high height, it is necessary to do a good job of safety protection measures for high-altitude work to avoid the occurrence of safety accidents. (3) When using scaffolding, it is necessary to ensure the stability and balance of scaffolding and prevent the tilt of scaffolding to ensure the safety of construction personnel.

prev
What is Galvanized Shuttering Props Scaffolding Shoring Steel Support Prop?
Multiple Types of "Fastening" Tools in Construction Engineering - Coupler
next
recommended for you
no data
GET IN TOUCH WITH Us

The company is located in Suzhou, China with convenient transportation, more than 11 years of scaffolding in-dustry production experience And 8 years of foreign trade experience. 
Contact Us
Contact person: Lane Pan
Tel: +86 13915798639
 WhatsApp:+8613915798639 
 Email:lane@antascaffolding.com
Add: 2/F, Building 4, Ruikang Science and Technology Park, No. 86 Suli Road, Changqiao Street, Wuzhong District, Suzhou City, Jiangsu Province, China.


Copyright © 2025 Suzhou Anta Scaffolding Engineering Co.,Ltd.  | Sitemap  | privacy policy
Contact us
whatsapp
wechat
contact customer service
Contact us
whatsapp
wechat
cancel
Customer service
detect